You are here: Home » News » Rebuild engine QSK45

Rebuild engine QSK45

Views: 0     Author: Site Editor     Publish Time: 2026-01-29      Origin: Site

Inquire

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button
Rebuild engine QSK45

First, Preliminary Preparation

1. Safety Precautions of rebuilding engine QSK45

Shut off the engine power and disconnect the negative battery cable to prevent electric shock.

Ensure the work area is well-ventilated and avoid contact with high-temperature components or coolant.

Wear protective gear (gloves, goggles, etc.).

2. Tools and Documentation Preparation

Prepare specialized tools (e.g., cylinder liner puller, torque wrench, OBD-II diagnostic scanner).

Consult the repair manual to understand engine structure, torque specifications, and fault codes.

Prepare genuine or high-quality replacement parts (e.g., piston rings, valves, bearings).

3. Engine Condition Verification

Record engine model, mileage, and fault symptoms (e.g., power loss, abnormal noises).

Photograph critical components for reference during reassembly.

Second, Fault Diagnosis

1. Preliminary Inspection

Check dashboard warning lights and read fault codes from diagnostic tools.

Inspect engine appearance (oil leaks, coolant leaks, component damage).

Start the engine and note any abnormal noises or vibrations.

2. In-Depth Analysis

Narrow down the problem area based on fault codes and symptoms (e.g., fuel system, valve train, turbocharger).

Example: If “Injector Failure” is reported, inspect injector atomization and electrical connections.

Third, Engine Removal

1. External Component Removal

Drain coolant and engine oil. Remove accessories including intake/exhaust manifolds, radiator, turbocharger, and alternator.

Mark all hose and wiring connection points to prevent misinstallation.

2. Internal Component Removal

Remove cylinder head: Loosen cylinder head bolts in manual sequence, carefully lift off cylinder head.

Extract pistons and connecting rods: Rotate crankshaft to position pistons at bottom dead center, use specialized tools to remove piston rings.

Remove crankshaft: Loosen main bearing cap bolts, extract crankshaft and inspect journal wear.

Replace cylinder liners: Use a liner puller to vertically extract old liners. Clean the cylinder block before installing new liners (apply lubricant).

Fourth, Component Inspection and Replacement

1. Critical Component Inspection

Piston rings: Check gap and side clearance. Replace if wear exceeds specifications.

Valves: Inspect for sealing integrity. Grind or replace if worn or scorched.

Turbocharger: Verify impeller rotation is smooth and check for oil leaks.

Injectors: Test spray pattern quality; clean or replace clogged injectors.

2. Cleaning and Restoration

Clean all components (e.g., cylinder block, cylinder head, pistons) to remove carbon deposits and oil residue.

Polish slightly worn journal surfaces; replace bearing shells or crankshaft for severe wear.


KELUO is a company of machinery, engines, used equipment and spare parts founded by Hanhan in combination with HANJIU, Elephant in the industry.
Leave a Message
Get A Quote

Links

Category

Contact Us

   +86-13930113681
   hebeikeluo@sjzhjsm.com
  +86-13930113681
   +86-13930113681
   Office Building 2, Jinling Building, Intersection of Yuhua Road and Yucai Street, Yuhua District, Shijiazhuang City, Hebei Province
Disclaimer: Caterpillar, Komatsu, Volvo, Deutz, Kubota, Perkins, etc. are registered trademarks of the trademark holders. The products described on this website are only applicable to the products provided by the above trademarks.
​Copyright © 2023 Hebei Keluo Construction Machinery Co., Ltd. All rights reserved. | Sitemap | Privacy Policy | Support By Leadong